On complex projects, fire safety does not sit only in code clauses or isolated drawings. A Fire Strategy Report brings the whole approach together in one document so architects, structural engineers, MEP designers, and operators work from the same plan.
It defines how the building should behave in a fire, how people will escape, and how systems such as smoke control and pressurization support that goal. For ventilation specialists, this report becomes the reference point for every major decision on ducts, fans, dampers, and control modes in fire conditions.
Key Questions a Fire Strategy Must Answer
Rather than listing equipment, a good fire strategy focuses on questions such as:
- How will occupants detect a fire and move to safety?
- How will structure, compartmentation, and doors resist flame and smoke spread?
- Where will smoke go, and how will ventilation and smoke control manage it?
- How will firefighters enter, move, and operate inside the building?
- How does the strategy satisfy local regulations and performance targets?
When these questions are explicit in the Fire Strategy Report, each discipline can design its systems to support a common FIRE SAFETY concept.
Typical Contents of a Fire Strategy Report
Occupancy and design basis
The report first sets the context:
- Building use, occupancy types, and expected headcounts by zone
- Design fire scenarios and relevant codes or performance standards
- Special risks, such as hazardous materials, deep basements, or long travel distances
This section provides the assumptions behind every later smoke and ventilation calculation.
Compartmentation and structural response
Fire compartments, rated elements, and structural behavior form the next layer:
- Locations, ratings, and roles of fire-resisting walls, floors, and doors
- Rules for penetrations and service routes through compartments
- Expected structural performance during design fires
Ventilation and duct routing must align with these decisions so that penetrations, shafts, and ducts do not weaken compartment boundaries.
Escape routes and protected spaces
The strategy then describes how people will move away from danger:
- Protected lobbies, corridors, and stair cores
- Maximum travel distances and alternative routes
- Refuge areas or fire command centers where required
These spaces often rely on smoke-control or pressurization systems, so their design and capacity link directly to the report’s escape concepts.
Ventilation, smoke control, and pressurization
For YAOAN VENTILATION and similar specialists, this chapter is central. It sets out:
- Which areas use smoke exhaust, which use pressurization, and which rely on natural venting
- Design fire sizes, smoke production rates, and tenability criteria for modeling
- Fan, damper, and duct roles in each fire mode, including fail-safe positions and control logic
Once documented, these requirements guide system sizing and Factory Acceptance Testing for fire-mode functions.
Detection, alarm, and control integration
Finally, the report explains how fire detection and control systems interact:
- Trigger points for smoke control, fan shutdown, and damper movement
- Priorities between normal HVAC control and fire-mode logic
- Interfaces with the building management system and firefighter controls
This integration ensures that AIRFLOW CONTROL in fire conditions follows the intended strategy rather than standard comfort algorithms.
How Ventilation and Smoke Systems Support the Fire Strategy
Maintaining tenable conditions in escape routes
Pressurization systems for stairs, lobbies, and some corridors rely directly on the Fire Strategy Report:
- Target pressure differentials and door-opening forces
- Required airflows with doors closed and with doors open
- Acceptable smoke ingress levels for defined time periods
Fans, dampers, and relief paths all size and position themselves around these values.
Controlling smoke movement in fire compartments
The report defines where smoke should move and where it must not:
- Zones that use mechanical smoke exhaust and defined make-up air paths
- Compartments where HVAC should stop to avoid spreading smoke
- Interfaces between smoke control and existing comfort systems, especially in shared ducts
YAOAN VENTILATION equipment for these areas must handle elevated temperatures, defined duty times, and specific control sequences that match the described scenarios.
Supporting firefighter operations
Firefighters need predictable conditions when they enter the building:
- Pressurized stairs and lobbies that remain clear of smoke
- Smoke exhaust systems that reduce layer height or temperature in selected areas
- Control panels and status indications that reflect the fire strategy’s zoning
The Fire Strategy Report maps these needs so mechanical design can put fans, ducts, and control stations in the right places.
Using the Fire Strategy Report Through the Project Life Cycle
Design and coordination phase
During design, the Fire Strategy Report:
- Guides architectural layouts for stairs, lobbies, shafts, and plant rooms
- Sets performance targets for ventilation and smoke-control calculations
- Helps resolve clashes between structural, architectural, and MEP needs
Coordination drawings and BIM models for ductwork, dampers, and louvers then evolve directly from these documented requirements.
Construction, testing, and handover
On site, the report remains a reference document:
- Contractors use it to confirm that installed systems match the fire concept.
- Commissioning teams test fans, dampers, and control modes against the described performance.
- Authorities and third-party reviewers check compliance using its assumptions and conclusions.
Results from integrated fire-mode tests should map back to the scenarios and objectives defined in the Fire Strategy Report.
Operation, modification, and review
After handover, facility managers and designers use the report as a baseline whenever changes occur:
- Fit-outs or change of use can be checked against the original fire strategy.
- Upgrades to fans, controls, or smoke systems can align with the established design fires.
- Fire risk assessments can reference the strategy to confirm that ventilation and smoke systems remain adequate.
When major modifications take place, updating the Fire Strategy Report keeps the building’s documented FIRE SAFETY approach synchronized with reality.
FAQ
What is a fire strategy report?
A fire strategy report is a formal document that explains how a building will manage fire and smoke risks. It covers compartments, escape routes, detection, suppression, and the role of systems such as smoke control and pressurization, and it links these measures to codes, standards, and performance targets.
What is the fire strategy standard?
The fire strategy standard refers to the codes, regulations, and technical guidance that shape each report. Exact documents vary by country and building type, but they usually include baseline fire codes and specialized guidance on structural resistance, escape, and smoke control design.
What is the fire management strategy?
A fire management strategy extends beyond design. It includes organizational measures such as training, maintenance, evacuation procedures, drills, and inspection routines that keep the building aligned with the fire strategy throughout its life.
What is the fire strategy and risk assessment?
The fire strategy describes how the building should behave in a fire, while the fire risk assessment evaluates how well that strategy addresses real risks and current conditions. Together, they define the technical measures and operational practices that protect people and property.
How much is a fire strategy report?
Cost depends on building size, complexity, height, use, and regulatory environment. A small simple building may require a relatively modest study, while a high-rise, hospital, or major infrastructure project needs a detailed, specialist-led report with modeling and extensive coordination.
What is the 4% rule in fire?
Different regions use “4% rules” in several contexts, often related to allowable openings, geometric limits, or smoke-layer criteria. Exact meaning comes from the local code or guidance in force, so engineers always interpret such rules within the specific standard they are applying on a project.
About YAOAN VENTILATION
YAOAN VENTILATION delivers optimized air and airflow management solutions backed by nearly three decades of engineering experience. Since 1996, we have focused on industrial-grade ventilation and fire protection systems for commercial buildings, infrastructure, and specialized environments. Our fans, smoke-control components, dampers, silencers, and precision-built aluminum ventilation parts are designed to align with project Fire Strategy Reports, supporting compartmentation, escape-route pressurization, and controlled smoke exhaust. By integrating equipment performance with clearly defined fire strategies, YAOAN VENTILATION helps project teams achieve reliable FIRE SAFETY, predictable system behavior, and long-term regulatory compliance.